Refurbishment of Cambridge Office Space for St John Ambulance

Brief

Brief

To produce an innovative layout design to provide training facilities within an existing light industrial unit in Cambridge.

Works

Works

To remove existing partitions, ceilings and air conditioning systems.  Reconstruction with upgrade to partitions flooring and alterations to the mezzanine floor.

New sound proof partitioning to form Training Rooms and Offices with WCs and new suspended ceilings

Reconfiguration and additional of mechanical ventilation and air conditioning

Provide lighting and power distribution.

Complete refurbishment of the workshop and other facilities in garage

Building alterations to form new windows and fire escapes.

External clean of building elevations, refurbishment and formation of external hard standings, smokers shelter, bicycle shelter, drainage

Installation of CCTV, intruder alarm and access controls.